Your gas turbine move can clear roads and still die at the border. When serial lists, HS codes or dual-use statements disagree with the bill of lading, you face delay, demurrage and a stranded lift that slips the critical path.

You cannot rebuild a clearance pack after the convoy is queued. If customs paperwork stops at a generic commercial invoice, you are carrying outage risk into every cross-border move.

USP&E Helps You Build a GT Customs Clearance Pack

We know how hard it is to keep critical lifts on date when border documents were assembled late. USP&E has delivered 150+ power projects in 45+ countries, with 25,000 MW contracted since 2002, and our 400+ engineers and project managers assemble serial lists, HS codes and dual-use statements so gas turbine generator moves clear without stranded lifts. We work under ISO 9001 and ISO 45001 certified systems with FCPA and OFAC controls. USP&E is a full-service EPC and O&M contractor, not a broker.

Assemble Documents That Match the Hardware

Assemble serial lists, HS codes, certificates of origin and dual-use statements for every gas turbine generator move. One mismatched serial is enough to hold a border.

Pre-clear temporary import or permanent entry rules with the destination customs broker before wheels turn.

Stage spare seals, photos and packing lists that match the bill of lading exactly.

Pre-brief the destination broker on dual-use language with the exact HS codes you will use. Last-minute code changes at the border create holds even when the hardware is innocent. Your pack should freeze codes before the convoy rolls and note who approved each code.

Treat Border Holds as Critical-Path Events

Write escalation cards for missing seals, photo mismatches and dual-use questions. Hope is not a clearance plan.

Hold a remanufactured GE Frame 6B or used/new gas turbines as cover if a border hold slips the critical path.

Photograph serial plates and seal numbers at the yard and again at the border staging point. Mismatches between those photo sets are how customs holds start. Your clearance pack should include both photo sets and a one-page escalation card naming who calls the broker when a seal does not match.

Hand the Pack into Site Logistics

Natural gas engines/stations can hold site auxiliaries while a held unit clears. Write that cover into the move pack.

Hand the clearance pack into site logistics before the convoy rolls. Leave commercial room for later blocks such as the new FX-45 when your load grows.

If your company also runs compute or campus load elsewhere, the same discipline carries over. AI gas turbines, hyperscale generators and gas turbines for compute need the same rigour, and later blocks such as the New USP&E FX-45 45MW Modular Gas Turbine for the Hyperscale Data Center sector in the USA can join a spine run by one hyperscale EPC/O&M team. Clearance discipline then scales into campus growth without border surprises.

Carry printed and encrypted digital copies of the clearance pack with the convoy lead and the site receiver. A single lost USB at the border should not stop the lift. Your escalation card should say which copy is authoritative if the two ever disagree.

USP&E Teams Behind Your Power Logistics Site

Remote sites need people who know frontier work. USP&E runs your GT spares and logistics programme from Johannesburg (22 Kildoon Rd, Bryanston) and Cape Town (31 Brickfield Road, Woodstock), where engineers plan mobilisation, spares and site supervision for projects far from the nearest service shop.

Further back in the chain, London (162-168 Regent Street) handles financing and contract structure for rotating spares, hot-section kits and containerised equipment; Colorado Springs (1755 Telstar Dr, Suite 300) and Knoxville (800 S Gay St, Suite 700) secure US equipment, parts and engineering support; and Wuxi, China (No. 1, Ningzhou Road, Wuxi) keeps Chinese-made switchgear and balance-of-plant moving.

For GT customs clearance packs, Johannesburg and Cape Town logistics engineers can pre-clear your serial lists with the broker before the convoy reaches the border. Regions served: USA | AFRICA | UK | UAE | CHINA. That team has carried 150+ power projects in 45+ countries and 25,000 MW contracted since 2002, ISO 9001 and ISO 45001 certified.

What USP&E Has Delivered for Power Logistics Buyers

You want proof that USP&E has moved turbine packages where customs packs cleared without stranded lifts. These projects show that record.

  • USP&E supplied 28 Cummins KTA50 containerised diesel gensets, 1,275 kVA each, for Perseus Mining’s Nyanzaga Gold Project in Tanzania.
  • Mining O&M recovery, Mali: USP&E took over a 100+ MW plant of 15 Cat CM32 engines left in critical condition, restored availability to about 95% and cut maintenance and repair cost per engine by 66%. Read the case study.
  • MAN redeployment, Iraq: USP&E moved a stranded 32 MW MAN plant, plus two surplus MAN generators, across four countries to an industrial buyer facing 12 to 18 month lead times for new engines. Read the case study.

HowTo: Build a GT Customs Clearance Pack

Your 3-step plan: 1. Share serial lists, Incoterms and destination rules under NDA. 2. Receive a clearance pack and a cover plan. 3. Pre-clear, move and receive under accountable logistics.

  1. Assemble serial lists, HS codes, certificates of origin and dual-use statements for every gas turbine generator move.
  2. Pre-clear temporary import or permanent entry rules with the destination customs broker.
  3. Stage spare seals, photos and packing lists that match the bill of lading exactly.
  4. Hold a remanufactured GE Frame 6B or used/new gas turbines as cover if a border hold slips the critical path.
  5. Leave commercial room for later blocks such as the new FX-45 when your load grows.
  6. Hand the clearance pack into site logistics before the convoy rolls.

Resources and live pathway

Data centres · EPC · O&M · About USP&E · Contact.

FAQ: SmartPower GT Customs Clearance

Why do GT moves fail at customs?

USP&E sees mismatched serials, weak HS codes and missing dual-use statements hold gas turbine generators at the border. Your pack must match the hardware and the bill of lading. A generic invoice never clears a critical lift. Your team stays in control of the decision at every step.

What belongs in a GT clearance pack?

USP&E includes serial lists, HS codes, certificates of origin, dual-use statements, photos and packing lists. Your pack should also name temporary versus permanent entry rules. Your team stays in control of the decision at every step. Share your data under NDA to begin.

How early should the broker see the pack?

USP&E pre-clears with the destination broker before wheels turn. Your schedule should treat broker questions as a gated step, not a roadside surprise. Your team stays in control of the decision at every step. Share your data under NDA to begin.

What cover should you plan for a border hold?

USP&E holds a remanufactured GE Frame 6B or used/new gas turbines, with natural gas engines/stations for auxiliaries. You set cover before the move, so a hold does not darken the site. Your team stays in control of the decision at every step.

Where are USP&E’s offices that support this work?

USP&E anchors GT customs clearance work in Johannesburg and Cape Town, where logistics engineers sit close to your border path. London structures contracts and finance, Colorado Springs and Knoxville reach US equipment supply, and Wuxi supports China supply chain and manufacturing. Every office works from the same project file.

Has USP&E delivered power projects like this before?

USP&E supplied 28 Cummins KTA50 containerised diesel gensets, 1,275 kVA each, for Perseus Mining’s Nyanzaga Gold Project in Tanzania. Public case studies also cover Barrick, Resolute and Kinross, where accountable EPC and O&M kept industrial power online. You can read each case study and judge the evidence yourself.

Is USP&E a broker for this equipment?

USP&E is not a broker. USP&E is a full-service EPC and O&M contractor that engineers, supplies, builds, commissions and operates power plants with its own engineers and project managers, so the team that builds your clearance pack stays accountable until the unit lands. You deal with one accountable team from first review to O&M.

How fast can USP&E respond on this topic?

USP&E can start reviewing your serial lists, Incoterms and destination rules as soon as you share them under NDA. Engineers flag document gaps first, then issue the clearance pack, with timing set by data quality and broker access. Your team stays in control of the decision at every step.

Clear Turbines at the Border Without Stranding the Lift

Get customs packs right and critical lifts clear on schedule. Get it wrong and the first sign is demurrage with a dark site waiting. USP&E will help you assemble, pre-clear and move with confidence.

Talk to an engineer about your GT spares and logistics programme: use the USP&E contact page, call +27 10 822 2324 or email info@uspeglobal.com. You can also search the USP&E inventory for equipment that fits.

Powering Possibility. Built for the Frontier.



USP&E — Offices

Colorado Springs: 1755 Telstar Dr, Suite 300

Knoxville: 800 S Gay St, Suite 700

London: 162-168 Regent Street

Johannesburg: 22 Kildoon Rd, Bryanston

Cape Town: 31 Brickfield Road, Woodstock

China: No. 1, Ningzhou Road, Wuxi

USA | AFRICA | UK | UAE | CHINA

400+ engineers and project managers worldwide · 150+ power projects in 45+ countries · 25,000 MW contracted since 2002 · ISO 9001 and ISO 45001 certified · FCPA & OFAC compliant

Phone: +27 10 822 2324 · Email: info@uspeglobal.com

SEARCH INVENTORY · uspeglobal.com