Operations and maintenance services

Engineers and control-room operators who run power stations, backed by SmartPower data.

Run by the people who build

USP&E provides operations and maintenance services worldwide. Over two decades, our teams have operated and maintained industrial power stations, with electrical engineers, E&IC engineers, mechanical engineers and control-room operators on the same roster.

Owners choose us when a plant has to meet an availability target and the people running it need support they can reach. Our EPC and O&M page shows how the same team can also build the plant.

What an O&M contract covers

Operations

Control-room operation, shift cover and reporting for the plant.

Maintenance

Planned servicing, overhauls and repairs, recorded in the CMMS.

Spares

Critical spares linked to work orders, so the right part is on site.

Performance backed by data

USP&E O&M contracts rest on performance guarantees supported by data. SmartPower monitoring and the UpKeep CMMS give both sides one record of how the plant is running. See how SmartPower works.

A track record in the field

On a 100+ MW engine fleet in Mali, a recovery programme brought reported availability to 95%. At Loulo-Gounkoto, also in Mali, USP&E refurbished the 104 MW station. The Mali case study has the detail.

Why owners hand us the keys

  • 400+ engineers and project managers across the company.
  • ISO 9001 and ISO 45001 systems on every site.
  • The same team can build, commission and then operate the plant.
  • Clear reporting from data, not from opinion.

Need a team to run your plant?

Call +27 10 822 2324 or email info@uspeglobal.com to discuss an O&M contract.