Power Plant EPC Liberia



USP&E Africa can carry out Power Plant EPC Liberia for heavy industry firms and companies in the mining sector. USP&E Africa, complete turnkey contractors, specialize in EPC and O&M services and have global experience, as well as current presence in West Africa (Sierra Leone). The process of implementing Power Plant EPC Liberia by USP&E Africa can be seen in detail on our main site (click here).

Power Plant EPC Liberia: Engineering Services

Our engineering services are provided with specialty in diesel generators, HFO and natural gas generators as well as full-service power station engineering, providing a surplus of engineering services including pre-construction tasks, site surveys, feasibility studies and data centre services. For more information please call 888-515-USPE or our South African office number at the bottom of this page.

Power Plant EPC Liberia: Procurement

At USP&E Africa, our team is a professional and experienced group that have worked on projects around the world and have the knowledge to make the best decisions on what materials and equipment best suit your prospective project. We carry out inspections, testing and expediting of equipment. We specialize in the procurement of new and surplus generators, low-hour used generators, tow-able generators, solar power generators, custom fuel tanks, automatic transfer switches, annunciators, dual-fuel conversion equipment, new and refurbished air handler units, and data centre equipment.

Power Plant EPC Liberia: Construction

USP&E Africa has an experienced construction team that offers services in facility commissioning, facility evaluation and all aspects of the construction process. For your Power Plant EPC  Liberia project, we can offer project/program management, general contracting, construction management and consulting services. We are committed to maintaining a safe and qualified workforce, providing quality products and services and adhering to the highest standards of ethics all while completing your project in a timely fashion.

Power Plant EPC Liberia: Operations and Maintenance

USP&E has a team of advanced and competent engineers that specialize in helping our customers manage the service and maintenance of their equipment. We help our clients plan for scheduled maintenance and minimize downtime due to repair interventions. As the most trusted supplier of operations and maintenance services in emerging markets, our clients know that they can count on us to refurbish their engines and power stations.

President Ellen Johnson Sirleaf set an ambitious yet hefty target when aiming to restore the electricity supply in Liberia by 2015. Before the country’s civil war, Liberia’s energy supply relied heavily on the hydropower plant at Mount Coffee, 30km north-east of Monrovia. It was destroyed in the fighting, and what little remained was looted, along with the country’s entire transmission and distribution equipment. The operations of the Liberia Electricity Corporation (LEC) ceased completely.

At USP&E Africa, we are committed to coming alongside heavy industry and mining firms in nations such as Liberia to accomplish goals such as the one set by President Ellen Johnson Sirleaf.

For more information on Power Plant EPC Liberia and the other services we (USP&E Africa) have to offer, please contact us at info@uspowerco.com or go to www.uspowerco.com.

Below is a full list of our other main services:

  •  Bankable feasibility studies for as little as R 500, 000.00
  • EPC and O&M services for HFO, Gas Turbine, and Hybrid solar and waste heat recovery solutions
  • Surplus, new, and reconditioned power station assets in stock and ready to ship
  • Full financing, leasing, or IPP options

 

USP&E Africa
Powering Business. Empowering People.

USP&E Africa (South Africa address)

JOHANNESBURG

Willow Wood Office Park

Cnr 3rd Ave & Cedar Road

Broadacres, Gauteng 2021

Tel: (011) 064 5600

Mob: (072) 955 2560

© 2026 USP&E
Privacy · FCPA & OFAC Compliance