Diesel Power Plant South Africa



Are you starting a project that involves setting up a Diesel Power Plant South Africa? USP&E Africa can design and install a Diesel Power Plant South Africa for heavy industry firms and companies in the mining sector. USP&E Africa has been operational in South Africa since the latter part of 2013 after setting up its strategic offices in Johannesburg. USP&E Africa are the strategic offices of the global company based in the US which was formed in 2002.

The company is focused on partnering with clients to provide power generation solutions in the heavy industry sector, as well as the mining sector. We build, provide engineering for, offer installation for, and provide service for conventional and renewable power solutions tailored to meet any requirement up to 500MW (For more info, click here).

 

Diesel Power Plant South Africa
Experienced Staff

USP&E Africa, complete turnkey contractors, specialize in Engineering, Procurement and Construction, as well as Operations & Maintenance services and have global experience. To view more on what we (USP&E Africa) can offer regarding Diesel Power Plant South Africa, please go to our main site (click here).

Diesel Power Plant South Africa: Engineering Services

Our engineering services are provided with specialty in diesel generators, HFO and natural gas generators as well as full-service power station engineering, providing a surplus of engineering services including pre-construction tasks, site surveys, feasibility studies and data center services. For more information please call 888-515-USPE or our South African office number at the bottom of this page.

Diesel Power Plant South Africa: Procurement

At USP&E Africa, our team is a professional and experienced group that have worked on projects around the world and have the knowledge to make the best decisions on what materials and equipment best suit your prospective project. We carry out inspections, testing and expediting of equipment. We specialize in the procurement of new and surplus generators, low-hour used generators, tow-able generators, solar power generators, custom fuel tanks, automatic transfer switches, annunciators, dual-fuel conversion equipment, new and refurbished air handler units, and data center equipment.

Diesel Power Plant South Africa: Construction

USP&E Africa has an experienced construction team that offers services in facility commissioning, facility evaluation and all aspects of the construction process. For your Diesel Power Plant South Africa project, we can offer project/program management, general contracting, construction management and consulting services. We are committed to maintaining a safe and qualified workforce, providing quality products and services and adhering to the highest standards of ethics all while completing your project in a timely fashion.

For more information on Diesel Power Plant South Africa and the other services we (USP&E Africa) have to offer, please contact us at info@uspowerco.com or go to www.uspowerco.com.

Below is a full list of our other main services:

  •  Bankable feasibility studies for as little as R 500, 000.00
  • EPC and O&M services for HFO, Gas Turbine, and Hybrid solar and waste heat recovery solutions
  • Surplus, new, and reconditioned power station assets in stock and ready to ship
  • Full financing, leasing, or IPP options

 

USP&E Africa (South Africa address)

JOHANNESBURG

Willow Wood Office Park

Cnr 3rd Ave & Cedar Road

Broadacres, Gauteng 2021

Tel: (011) 064 5600

Mob: (072) 955 2560

© 2026 USP&E
Privacy · FCPA & OFAC Compliance