Two ways we can help
Some visitors come to us with a turbine or transformer that has to cross a border and land on a plinth on time. Others run a plant and want SmartPower monitoring and CMMS discipline behind their operations team. USP&E handles both, and USP&E can do both.
If you still need the equipment itself, search the USP&E inventory.
Get in touch
Request a callback
Leave your details and an engineer will call you back about logistics or SmartPower.
Contact form ›Details that speed up a logistics or SmartPower enquiry
- For a move: equipment type, weight, dimensions and origin port.
- The destination site and its road, crane and laydown constraints.
- For SmartPower: the plant type, unit count and any CMMS already in use.
- Customs, insurance or permit steps you have already started.
- The date the equipment must be on site, or the date monitoring must be live.
Useful reading before you write
Our offices
USP&E works from six offices in the USA, the UK, South Africa and China, and is certified to ISO 9001 and ISO 45001.
Colorado Springs
1755 Telstar Dr, Suite 300, Colorado Springs, USA
Knoxville
800 S Gay St, Suite 700, Knoxville, USA
London
162-168 Regent Street, London, UK
Johannesburg
22 Kildoon Rd, Bryanston, South Africa
Cape Town
31 Brickfield Road, Woodstock, South Africa
China
No. 1 Ningzhou Road, Wuxi, China
Certified and accountable
Logistics and operations fail at the hand-offs. USP&E keeps engineering, shipping, commissioning and operation under one roof, with ISO 9001 and ISO 45001 systems behind each step.
Facing a power challenge on site?
Call +27 10 822 2324 or email info@uspeglobal.com and describe the move or the plant.
