Expert Power Plant EPC Services DR Congo



 

USP&E Africa provide Expert Power Plant EPC Services DR Congo. We are aware of the nation’s poor electrification rate. With DR Congo’s huge population, it only makes sense to work hard towards exploiting the potential that the country has. We provide our services to firms in the mining sector, Heavy Industry as well as other projects that demand vast amounts of power supply.

The country relies heavily on existing hydropower plants and hope to have more hydropower generated for the growth and development of DR Congo. Having experience in multiple projects around the world and over the years, we know what it takes to partner alongside our clients and work hand in hand with you to get the best possible results for your project or company.

We sell Containerized HFO Diesel Generators, diesel gensets, natural gas generators, gas turbines, solar power systems and other renewable energy solutions. We have a great staff of engineers who are experienced in the site, surveys, design and construction of power plants, being well-versed in every OEM equipment you can think of. You can trust USP&E Africa, as an Expert Power Plant EPC Services DR Congo firm.

We have strategic partnerships with Hyundai Heavy Industries, Cummins, Wartsiila, Nigata, CAT and more. Click here, to take a look at our online inventory.

Please get in touch with us today, if you want to know more about our power plant solutions like our diesel generators, natural gas generators, and other things we have in stock, we’re just a call away. Call today if you would like our Expert Power Plant EPC Services DR Congo, USP&E Africa is the global power plant solutions provider for your company and all the power needs of your project. Also, check out www.uspowerco.com. If your company or company’s project is not in South Africa, we have strategic offices in other locations, just click here to view.

Here’s a list of our other main services that may interest you:

  • Bankable feasibility studies for as little as R 500, 000.00
  • EPC and O&M services for HFO, Gas Turbine, and Hybrid solar and waste heat recovery solutions
  • Surplus, new, and reconditioned power station assets in stock and ready to ship
  • Full financing, leasing, or IPP options

 

USP&E Africa (South Africa address)

JOHANNESBURG

Willow Wood Office Park

Cnr 3rd Ave & Cedar Road

Broadacres, Gauteng 2021

Tel: (011) 064 5600

Mob: (072) 955 2560

 

© 2026 USP&E
Privacy · FCPA & OFAC Compliance