Reliable Power Supplier IPP Mali


USP&E Africa is a Reliable Power Supplier IPP Mali and has provided services to Resolute Mining LTD, supplying and installing generators, as well as carrying out expert O&M (Operations and Maintenance) services. We are a non-governmental service provider in power, providing equipment and services for power generation in emerging markets around the world. We have been getting in the mix of power supply for over a decade and desire to help African nations like Mali develop, especially through the provision of sufficient power supply.

Power Plant EPC and O&M

We specialize in the design and construction of power stations, having several years of experience and being well versed with the different OEM’s (Original Equipment Manufacturers) of our HFO Generators and our Diesel Generators in stock. Let us know your needs and we’ll put together a Bankable Feasible Study for your company, and build a custom power plant for you.

SmartPOWER Technology

SmartPOWER Technology is an online fuel efficiency and O&M tool that digitally monitors power plants. Reports engine vital stats, such as total energy output, total run time, speed, frequency, and load.

Get in touch with us today for more information on what we have in stock, as well as our affordable prices. For more information on how we strive to be a Reliable Power Supplier IPP Mali or other USP&E Africa products and services in general, go to www.uspowerco.com. To view the location of our other offices, click here.

Below is a list of our other main services that may interest you:

  • Bankable feasibility studies for as little as R 500, 000.00

  • EPC and O&M services for HFO, Gas Turbine, and Hybrid solar and waste heat recovery solutions

  • Surplus, new, and reconditioned power station assets in stock and ready to ship

  • Full financing, leasing, or IPP options

USP&E Africa (South Africa address)

JOHANNESBURG

Willow Wood Office Park

Cnr 3rd Ave & Cedar Road

Broadacres, Gauteng 2021

Tel: (011) 064 5600

Mob: (072) 955 2560

© 2026 USP&E
Privacy · FCPA & OFAC Compliance