USP&E Africa can carry out Power Plant EPC Liberia for heavy industry firms and companies in the mining sector. USP&E Africa, complete turnkey contractors, specialize in EPC and O&M services and have global experience, as well as current presence in West Africa (Sierra Leone). The process of implementing Power Plant EPC Liberia by USP&E Africa can be seen in detail on our main site (click here).
Power Plant EPC Liberia: Engineering Services
Our engineering services are provided with specialty in diesel generators, HFO and natural gas generators as well as full-service power station engineering, providing a surplus of engineering services including pre-construction tasks, site surveys, feasibility studies and data centre services. For more information please call 888-515-USPE or our South African office number at the bottom of this page.
Power Plant EPC Liberia: Procurement
At USP&E Africa, our team is a professional and experienced group that have worked on projects around the world and have the knowledge to make the best decisions on what materials and equipment best suit your prospective project. We carry out inspections, testing and expediting of equipment. We specialize in the procurement of new and surplus generators, low-hour used generators, tow-able generators, solar power generators, custom fuel tanks, automatic transfer switches, annunciators, dual-fuel conversion equipment, new and refurbished air handler units, and data centre equipment.
Power Plant EPC Liberia: Construction
USP&E Africa has an experienced construction team that offers services in facility commissioning, facility evaluation and all aspects of the construction process. For your Power Plant EPC Liberia project, we can offer project/program management, general contracting, construction management and consulting services. We are committed to maintaining a safe and qualified workforce, providing quality products and services and adhering to the highest standards of ethics all while completing your project in a timely fashion.
Power Plant EPC Liberia: Operations and Maintenance
President Ellen Johnson Sirleaf set an ambitious yet hefty target when aiming to restore the electricity supply in Liberia by 2015. Before the country’s civil war, Liberia’s energy supply relied heavily on the hydropower plant at Mount Coffee, 30km north-east of Monrovia. It was destroyed in the fighting, and what little remained was looted, along with the country’s entire transmission and distribution equipment. The operations of the Liberia Electricity Corporation (LEC) ceased completely.
At USP&E Africa, we are committed to coming alongside heavy industry and mining firms in nations such as Liberia to accomplish goals such as the one set by President Ellen Johnson Sirleaf.
For more information on Power Plant EPC Liberia and the other services we (USP&E Africa) have to offer, please contact us at info@uspowerco.com or go to www.uspowerco.com.
Below is a full list of our other main services:
- Bankable feasibility studies for as little as R 500, 000.00
- EPC and O&M services for HFO, Gas Turbine, and Hybrid solar and waste heat recovery solutions
- Surplus, new, and reconditioned power station assets in stock and ready to ship
- Full financing, leasing, or IPP options

USP&E Africa (South Africa address)
JOHANNESBURG
Willow Wood Office Park
Cnr 3rd Ave & Cedar Road
Broadacres, Gauteng 2021
Tel: (011) 064 5600
Mob: (072) 955 2560
Privacy · FCPA & OFAC Compliance