You might be familiar with the ongoing power problem in Africa, but how much do you know about USP&E Africa? A response to power problems in the form of a company.

USP&E Africa is a power generation solutions company that is proficient in EPC and O&M power plant services.
Africa Ripe for Power Plant EPC and O&M
Reportedly, Sub-Saharan Africa’s installed generation capacity for power is just 68 gigawatts (roughly equivalent to the whole of Spain). Moreover, due to old power plants and poor O&M (Operations and Maintenance) services, a quarter of that generated capacity is unavailable. These lingering power problems have been escalating and have now affected at least 55% of the continent. This has had an effect on economic growth and productivity in the developing nations of Africa. The need for installed diesel or HFO power plants is becoming more and more prevalent. Moreover, having power plant diesel generators, along with power plant teams that are capable of carrying out Operations and Maintenance services with proficiency, will fuel the productivity and lifespan of any company’s investment in them.
USP&E is a power generation solutions company with its headquarters in the USA, but also has strategic offices in South Africa and Sierra Leone. USP&E Africa is an extension of the American establishment that specializes in power station EPC and O&M services. USP&E sells deals in Diesel Generators, Natural Gas Generators, Dual-Fuel Generators, and GE Turbine Generators. Also, the company has strategic associations with Hyundai, Wärtsilä, Niigata, MAN, Cummins, Baldor, Perkins, MTU/Detroit Diesel, CAT (Caterpillar), Fairbanks Morse, Waukesha, as well as our own USP&E brand for power station equipment.
USP&E Africa: Bringing Professional EPC Services to Africa
USP&E has experience in power station design and installation, as well as carrying out shipment services to our clients. USP&E currently carries out O&M services for the London Mining Company (UK) in Sierra Leone. The company built a custom 13 MW power plant for the Marampa iron ore mine, a project which they started in 2010 and have continued with servicing up till today.
For more information on purchasing a diesel generator (both new and used), gas turbines, HFO power plants or containerized power stations contact us at info@uspowerco.com or go to www.uspowerco.com to view more of our power station equipment and services.
Below is a full list of our other main services:
- Bankable feasibility studies for as little as R 500, 000.00
- EPC and O&M services for HFO, Gas Turbine, and Hybrid solar and waste heat recovery solutions
- Surplus, new, and reconditioned power station assets in stock and ready to ship
- Full financing, leasing, or IPP options
USP&E Africa (South Africa address)
JOHANNESBURG
Willow Wood Office Park
Cnr 3rd Ave & Cedar Road
Broadacres, Gauteng 2021
Tel: (011) 064 5600
Mob: (072) 955 2560
Privacy · FCPA & OFAC Compliance
