Hyundai Packaged Power Station South Africa



Hyundai Heavy Industries Co., Ltd (HHI) is a strategic partner of US Power and Environment (USP&E), and our company (USP&E) is glad to partner alongside one of the world’s top OEM’s of diesel generators and diesel engines. Having recently established strategic offices in Johannesburg, South Africa, USP&E Africa is pleased to inform our customers that we supply Hyundai Packaged Power Station South Africa. The Engine and Machinery Division of Hyundai Industries Co., Ltd. is one of the leading diesel engine manufacturers in the world and has been recognized as the world’s top diesel engine manufacturer since 1978. Thanks to innovation and technological progression, Hyundai have been able to develop a Packaged Power Station that we are sure will satisfy the power needs of our customers. 

Hyundai Packaged Power Station South Africa
Powering Business. Empowering People.

 

Features

  • Base load operation
  • Diesel oil/Heavy fuel oil/ Natural gas use
  • 40 ft. container size
  • Easy transportation
  • Earth-friendly
  • Low cost of operating and maintenance

General Specifications

Engine Model

6H17/28

8H17/28

6H21/32

8H21/32

9H21/32

Engine (kW)

690/720

920/960

1,200

1,600

1,800

Generator (kW)

645/673

865/902

1,128

1,505

1,701

Total Weight (ton)

24

30

42

48

50

Dimension (WxHxL)

2.4m x 3.4m x 12m (Container Size)

Cooling Method

Radiator/ Cooling Tower

Speed (rpm)

900/1,000

Fuel

Diesel Oil/ Heavy Fuel Oil

 

Engine Model

5H17/24G

6H17/24G

7H17/24G

8H17/24G

9H17/24G

Engine (kW)

455/550

546/660

637/770

728/880

819/990

Generator (kW)

428/817

513/630

599/723

684/827

770/930

Total Weight (ton)

22

24

25

26

28

Dimension (WxHxL)

2.4m x 2.9m x 12m (Container Size)

Cooling Method

Radiator/ Cooling Tower

Speed (rpm)

1,000/ 1,200

Fuel

Natural Gas

 

Description

Hyundai System

Conventional

Engine Speed 900 – 1,000 rpm 1,500 – 1,800 rpm
Major Usage Base Load Continuous Operation Emergency Operation Peak-Cut
Fuel Use Heavy Fuel Oil # 6, Diesel Oil # 2 Diesel Oil #2
Availability More than 88% Less than 50%
Maintenance Simple & Easy Done at Site Complicated
Fuel Consumption (SFOC˜) 50Hz: 189 g/kW || 60Hz: 187 g/kW About 215 g/kW
Life Time More than 20 years Less than 10 years
Maintenance Hour [Cyl. Head] 12, 000 hr. Operation 7,500 hr. Operation

˜SFOC: Without engine driven pumps

USP&E Africa: Our EPC Services with Hyundai Packaged Power Stations South Africa

With staff that are well-versed in EPC and O&M with various OEM diesel generators, we can carry out this professional work for you. Having had years of experience in power plant engineering and working with our OEM partners like Hyundai. USP&E Africa has employees that can serve on a long term to carry out Operations and Maintenance of your Hyundai Packaged Power Station South Africa.

For more information on purchasing a Hyundai Packaged Power Station South Africa or USP&E Africa in general, click here or go to www.uspowerco.com.

Below is a full list of our other main services:

  • Bankable feasibility studies for as little as R 500, 000.00
  • EPC and O&M services for HFO, Gas Turbine, and Hybrid solar and waste heat recovery solutions
  • Surplus, new, and reconditioned power station assets in stock and ready to ship
  • Full financing, leasing, or IPP options

 

USP&E Africa (South Africa address)

JOHANNESBURG

Willow Wood Office Park

Cnr 3rd Ave & Cedar Road

Broadacres, Gauteng 2021

Tel: (011) 064 5600

Mob: (072) 955 2560

 

© 2026 USP&E
Privacy · FCPA & OFAC Compliance