Power Plant/Generation Station EPC Company in South Africa



USP&E Africa is a well-recognized Power Plant/generation station EPC (Engineering, Procurement and Construction) company in South Africa.  The company is a complete turnkey contractor, having clients from all around the world and continuing to establish itself on the African continent. With its headquarters in the United States, the company is increasing its global awareness, specifically in Africa, after having been present for almost 5 years. USP&E Africa works alongside the London Mining Company in Sierra Leone at an iron ore mine in Marampa. USP&E Africa built a custom-designed 13 MW power plant and is currently responsible for the Operations & Maintenance of the generation station that powers the mining and processing. However, our portfolio has since grown and reached other sub-Saharan countries in Africa:

Angola (Oil Field Support) – O&M and repair services

Ghana (Asanko Gold) – Definitive Feasibility Study for 20MW Power Plant

Tanzania (Golden Pride) – Switchgear upgrade

South Africa (Eskom) – T&D, Transformer, Control Upgrades

 

Professional EPC (Engineering, Procurement and Construction) Services in Africa

Our active response to the deficiency of power in Africa is to power forward business in the emerging markets of the continent. Since 2002, our selling and installing of diesel generators and natural gas generators has been motivated by the bigger picture that we sum up in our mission, “Powering Business. Empowering People”. With expert engineers that are well versed with the various OEM generators on the market, we have a team that is very capable of designing the installation. We also carry out procurement of the necessary materials and lastly, build the project. Our EPC services include the complete execution, commissioning, and start-up of our client’s project. Both our project management’s overview and our construction team’s efforts work towards the completion of the power plant/ energy generation station is done within budget and on a timely basis.

Power Plant EPC Company in South Africa

Specialize in supplying New and Used Diesel Generators

At USP&E Africa we offer a wide range of new and used diesel generators of various manufacturing brands. Some of our strategic associations include :  Hyundai, Wärtsilä, Niigata, MAN, Cummins, Baldor, Perkins, MTU/Detroit Diesel, Cat, Fairbanks Morse, Waukesha, as well as our own USP&E brand. We also have natural gas gensets, dual-fuel gensets, and gas turbine gensets.

Experience

Our company has massive experience in several projects that we’ve been involved in North America, Europe, Asia and Africa.

USP&E Africa offers a range of power plant (energy generation) solutions such as BFS (Bankable Feasibility Studies), full financing, leasing, or IPP options, etc. These can be viewed in detail on our main website www.uspowerco.com, or for more information, you can contact us (info@uspowerco.com; (011) 064 5600).

© 2026 USP&E
Privacy · FCPA & OFAC Compliance