US Power and Environment Africa (USP&E Africa) is an EPC (Engineering, Procurement and Construction) contractor which, as the contracting arrangement stands for, engineers or designs the installation, procures the necessary materials and installs the actual project for its clients. USP&E Africa has a proficient and experienced team that works towards energy generation solutions for Power Plant EPC South Africa needs. The company’s offices can be located in Johannesburg, after recently extending their congenital presence in Africa. The company has been in Sierra Leone since September 2010 after installing a custom-designed 13MW power plant for the Marampa iron ore mine. After this, USP&E Africa continues to perform Operations & Maintenance services for our client (London Mining PLC).
Specialists in Power Plant EPC South Africa

Our engineering, procurement and construction project with London Mining Company uses state-of-the-art Hyundai generators (using Hyunai’s HiMSEN engine Family). At USP&E Africa, we have earned a reputation for excellence with our clients around the world, aiming for a high standard of construction whilst providing our customers with efficient and cost-savings solutions. For Power Plant EPC South Africa needs, USP&E Africa covers many different areas from the mining sector, government entities or any company or firm that requires a huge flow of power for business activities. For more insight on our EPC services, click here.
We are an award winning company that hopes to extend our services to the many emerging markets in Africa, helping the continent progress economically, especially after the recent slack it (Africa) has suffered from.
USP&E Africa is a turnkey contractor which was founded in the United States (location of our current headquarters), that focuses on various means of providing power generation solutions. Below is a full list of our main services:
- Bankable feasibility studies for as little as R 500, 000.00
- EPC and O&M services for HFO, Gas Turbine, and Hybrid solar and waste heat recovery solutions
- Surplus, new, and reconditioned power station assets in stock and ready to ship
- Full financing, leasing, or IPP options
USP&E Africa (South Africa address)
JOHANNESBURG
Willow Wood Office Park
Cnr 3rd Ave & Cedar Road
Broadacres, Gauteng 2021
Tel: (011) 064 5600
Mob: (072) 955 2560
To learn more about Power Plant EPC South Africa or the company, go to our website(s): www.uspeglobal.com or www.uspowerco.com.
Privacy · FCPA & OFAC Compliance