SmartPower logistics. Parts, people, and plants. | USP&E · About us
About USP&E
Powering Possibility. Built for the Frontier.
Your mine, plant or remote site cannot wait for a weak grid. SmartPower logistics. Parts, people, and plants. | USP&E is part of USP&E, the engineering partner that helps mining and industrial owners put dependable power on site, from containerised gensets to complete gas turbine power stations, designed, built and operated by one accountable team.
The problem we solve
When power arrives late or fails in service, a data center misses its go-live date, a mine stops moving ore and a plant loses production. Too often the owner is left between a broker who sold the equipment and contractors who each own one piece of the job.
Not a broker. A full-service EPC and O&M partner.
USP&E is a full-service engineering and design house. We design, procure, build, commission and operate open-cycle and combined-cycle power stations, gas turbine plants and reciprocating engine plants, so one team owns the result from first study to long-term operation. USP&E is ISO 9001 and ISO 45001 certified.
A simple plan
Tell us your load, fuel, frequency (50 or 60 Hz) and target date.
We specify the right equipment and execute EPC through commissioning.
Our O&M teams run and maintain the plant with Extreme Ownership for the life of the asset.
Track record
- 150+ power projects in 45+ countries
- 25,000 MW contracted since 2002
- 400+ engineers and project managers
Global reach, local teams
USP&E supports data center and industrial owners from offices in the United States, the United Kingdom, South Africa and China, with project teams across Africa and the UAE.
USA | AFRICA | UK | UAE | CHINA
1755 Telstar Dr, Suite 300
800 S Gay St, Suite 700
162-168 Regent Street
22 Kildoon Rd, Bryanston
31 Brickfield Road, Woodstock
No. 1, Ningzhou Road, Wuxi
What success looks like
Power on site when you need it, a plant that performs to its design, and one partner accountable for the life of the asset.
Frequently asked questions
Is USP&E a broker?
No. USP&E is a full-service engineering and design house. We deliver EPC and O&M for power stations, so one team is accountable from study to long-term operation.
Where are USP&E's offices?
USP&E has offices in Colorado Springs and Knoxville (USA), London (UK), Johannesburg and Cape Town (South Africa) and Wuxi (China), serving clients across the USA, Africa, the UK, the UAE and China.
What is the USP&E modular gas turbine?
The New USP&E FX-45 45MW Modular Gas Turbine for the Hyperscale Data Center sector in the USA, with slots from 2028 to 2030.
How do I start a project with USP&E?
Call +27 10 822 2324, email info@uspeglobal.com, or search live inventory at uspeglobal.com/inventory/.
Ready to talk about your next project?
Call +27 10 822 2324 or email info@uspeglobal.com.
