Power Plant Generators for sale South Africa can be purchased from USP&E Africa. We are turnkey contractors that specialize in power plant solutions, encompassing full EPC (Engineering, Procurement and Construction) and O&M (Operations and Maintenance) of Power Plants, as well as feasibility studies and other services which can be viewed below or on our main site (Click here).
At USP&E Africa we sell Diesel Generators, Natural Gas Generators, Dual-Fuel Generators, and GE Turbine Generators. Our company has strategic associations with Hyundai, Wärtsilä, Niigata, MAN, Cummins, Baldor, Perkins, MTU/Detroit Diesel, Cat, Fairbanks Morse, Waukesha, as well as our own USP&E brand. Our company places emphasis on providing power plant solutions to emerging markets in Sub-Saharan Africa, the above list shows the power plant generators for sale South Africa that we have in stock. To view our online inventory, click here.
About USP&E Africa
USP&E Africa (present in South Africa and Sierra Leone) has been set up as the strategic offices of the global company that has its headquarters in the United States. USP&E was founded in 2002 by current CEO and President Will Gruver, who, along with his team, have worked hard to turn the company into one of the most trusted suppliers of EPC and O&M services. The company has worked hard for over a decade in the provision of these power plant solutions around the world. Below is one of our featured installations in Guatemala.
USP&E Africa Featured Installation
USP&E’s EPC team is working with Hyundai to supply diesel power to the Xan Oilfield Power Plant.
Our Client: Perenco Guatemala Ltd.

Perenco Guatemala Ltd.
Location: Guatemala
Start Date: February 2013
Scope: Custom-designed 13.6 MW diesel power plant, installation & commissioning.
Contact us today, we aim for clients in the heavy industry or mining sector. However, if you have a project that you think could benefit from a well build designed power plant generator, USP&E Africa have the experience and proficiency to carry out the job.
For more information on Power Plant Generators for Sale South Africa and the other services we (USP&E Africa) have to offer, please contact us at info@uspowerco.com or go to www.uspeglobal.com.
Below is a full list of our other main services:
- Bankable feasibility studies for as little as R 500, 000.00
- EPC and O&M services for HFO, Gas Turbine, and Hybrid solar and waste heat recovery solutions
- Surplus, new, and reconditioned power station assets in stock and ready to ship
- Full financing, leasing, or IPP options
USP&E Africa (South Africa address)
JOHANNESBURG
Willow Wood Office Park
Cnr 3rd Ave & Cedar Road
Broadacres, Gauteng 2021
Tel: (011) 064 5600
Mob: (072) 955 2560
Privacy · FCPA & OFAC Compliance
