HFO Power Plant Design South Africa



Are you looking for a company that provides expert power plant services, specifically in HFO Power Plant Design South Africa? You’re in the right place, get in touch with us USP&E Africa, we specialize in HFO Power Plant Design South Africa, EPC and O&M, full financing, leasing, or Independent Power Producer option and more (click here to go to our main site).

Click here to read more on our EPC (Engineering, Procurement and Construction)

Click here to read more on our O&M Services

 

Diesel Packaged Power Station Johannesburg
USP&E Power Plant

Our Containerized HFO Generators

Our containerized HFO Power Plant is a generator in a shipping container that runs on heavy fuel oil, we also supply generators that run on diesel and medium fuel oil.

The stationary power station will be supplied with all auxiliaries required for the proper operation of the power plant. The following table is a representative listing of the included auxiliary equipment.

  • Fuel oil system
  • Water treatment system
  • Lube oil system
  • Instrumentation
  • LO filling pump
  • HFO unloading pump
  • LO purifier unit
  • HFO settling tank with accessories
  • HFO supply pump
  • FO booster module
  • LO storage tank with pump
  • HFO purifier unit
  • Cooling water system
  • Exhaust gas boiler system
  • Starting air system
  • Electrical units
  • Exhaust gas system
  • Generator
  • Intake air system
  • Oily water separator
  • Suction heater for storage tank
  • FO drain tank

 

For more information on our HFO Power Plant Design South Africa and the other services we have to offer, please contact us at info@uspowerco.com or go to www.uspowerco.com.

Below is a full list of our other main services:

  • Bankable feasibility studies for as little as R 500, 000.00
  • EPC and O&M services for HFO, Gas Turbine, and Hybrid solar and waste heat recovery solutions
  • Surplus, new, and reconditioned power station assets in stock and ready to ship
  • Full financing, leasing, or IPP options

USP&E Africa (South Africa address)

JOHANNESBURG

Willow Wood Office Park

Cnr 3rd Ave & Cedar Road

Broadacres, Gauteng 2021

Tel: (011) 064 5600

Mob: (072) 955 2560

© 2026 USP&E
Privacy · FCPA & OFAC Compliance