GE TM2500 Mobile Gas Generator

GE TM2500+ GEN 6 Dual Fuel Generator for sale

USP&E Global is exclusively offering GE TM2500 mobile power plants along with all BOP, O&M, and EPC required. Our TM2500 units are ready to ship immediately to supply your industrial project with dependable power. These energy assets offer fast-track energy solutions that are capable of producing power within 1 week of delivery. Access up to 35MW and full power within 10 minutes from a start-up with the mobile GE TM2500 from USP&E Global.

Get to know the GE TM2500 Generator

What is a TM2500 generator?

The TM2500 is a modular mobile aero-derivative gas turbine generator produced by General Electric, capable of producing up to 35 megawatts. This power plant has an 11-day installation and commissioning time while being highly mobile as it is mounted on a towable skid/trailer. This gas turbine by developed GE, allows for access to fast power and this makes it ideal for emergency situations.

The TM2500 modular generator can operate on natural gas, diesel and liquid petroleum gas. This energy asset is highly scalable due to its modular design and operates at a rate of 37% efficiency. Find out more about this asset by clicking here.

How much does a GE TM2500 cost?

These units are available for purchase from USP&E Global from $14,750,000 (USD) in their inventory. These units are excellent solutions for projects that need fast power that is scalable and reliable. A perfect asset for crypto mining, data centers, or backup power. USP&E provides comprehensive engineering, EPC, and O&M services for these power plants with 20 years of experience and a worldwide team of over 150 technicians and engineers.

Video by ge.com

How does the TM2500 Gas Turbine Generator work?

The gas turbine engine has been at the vanguard of the military Jet fighters and still hangs under the wings of commercial planes. Manufacturers of these engine types have been building industrial gas turbines for decades hence why many gas turbines, large and small exist. Some of these gas turbines are specially designed for largescale industrial applications such as the TM2500 generator.

The aerobic-derived gas turbines used for these industrial applications are modeled after existing aircraft engines. Gas-generating agent units can start faster for peak and emergency power generation. In addition, the pneumatic turbines provide lower weight in one smaller footprint, ideal for offshore rigs.

What are the benefits of the TM2500 gas turbine?

The benefits of these gas turbines are that they offer fast power, which makes them suitable for emergency power applications and industrial projects requiring fewer delays in power supply. They have a modular design making them scalable to produce power under various loads. These units have additional parts capabilities to make them customizable for your power requirements. These gas turbines are reliable and dependable when it comes to power as there are 300 units currently deployed worldwide.

This gas turbine offers fuel flexibility with the capability to run on diesel or natural gas. This makes these power plants increasingly dynamic for teams facing various environmental circumstances. The mobility of these units being on a skid makes them easier to move from site to site. This makes them easily transportable allowing them to be moved when required.

GE TM2500 gas turbines specifications?

The units for sale by USP&E Global have the following specifications:

Manufacturer: GE
Model: TM2500+ GEN 6
Year: 2014
Condition: Used
Wattage: 30 MW
Fuel type: Dual Fuel
Hours: 2000-4000 Approx
Hz: Dual Fuel Natural Gas/Diesel

USP&E Global offering TM2500 gas turbines for sale

Buy your GE TM2500 Gas Turbine today

Contact USP&E Global at info@uspeglobal.com to gain access to the purchase of the TM2500 by General Electric today!

USP&E Global ampersand
© 2026 USP&E Privacy · FCPA & OFAC Compliance