Case Studies: Power Projects Delivered | USP&E

SmartPower Logistics

Case Studies: Power Projects Delivered by USP&E

You are about to trust a contractor with equipment, logistics and operations, and claims are easy to make. Without real projects to check, you are taking a risk on words.

These case studies show what USP&E has delivered, where and how.

Projects You Can Check

We publish case studies so you can judge our work directly. USP&E projects span mining, utilities, industry and data centres across many countries. USP&E is a full-service EPC and O&M contractor, not a broker.

What the Case Studies Show

Each project tested a different part of our model: supplying equipment at scale, moving it to remote sites, rebuilding turbines, refurbishing stations and operating plants for years. Together they show one company carrying responsibility from asset to operation.

Full write-ups are published on the USP&E case studies page, and the summaries below link to them.

How Logistics Shaped These Projects

Many of these sites were far from ports and workshops. Containerised gensets, heavy turbine packages and engine spares all had to arrive in the right order, and operations teams needed reliable spares supply afterwards. That experience informs how SmartPower Logistics plans every delivery today.

Similar planning supports our work mobilising generators into Africa and shipping mobile gas turbines.

USP&E Offices Behind These Projects

For the projects in our case studies, the Johannesburg team (22 Kildoon Rd, Bryanston) runs commercial and engineering leadership while Cape Town (31 Brickfield Road, Woodstock) supports field crews and shipping. Ask the office nearest your project to discuss the case study closest to your situation. Colorado Springs (1755 Telstar Dr, Suite 300) and Knoxville (800 S Gay St, Suite 700) cover US assets and buyers, London (162-168 Regent Street) covers finance-facing work, and Wuxi (No. 1, Ningzhou Road, Wuxi) covers fabrication. Regions: USA | AFRICA | UK | UAE | CHINA. The record is 150+ power projects in 45+ countries and 25,000 MW contracted since 2002, run by 400+ engineers and project managers. ISO 9001 and ISO 45001 certified.

Selected Case Studies

You can read each project in full on the USP&E case studies page.

  • USP&E supplied 28 Cummins KTA50 containerised diesel gensets, 1,275 kVA each, for Perseus Mining’s Nyanzaga Gold Project in Tanzania.
  • Barrick Gold, Mali: USP&E refurbished and supported a 104 MW mining power station. Read the case study.
  • Resolute Mining, Syama, Mali: USP&E installed and operated a 30 MW Caterpillar power station from 2007 to 2010. Read the case study.
  • NEOM, Saudi Arabia: USP&E supplied three zero-hour Siemens SGT-400 gas turbines. Read the case study.
  • Kinross Gold, Mauritania: USP&E engineered and executed Caterpillar power station backup for a large-scale mining operation. Read the case study.
  • USP&E has refurbished seven GE Frame 6B gas turbines to zero hours in-house for major US hyperscale data-centre developers.

Using the Case Studies

Your 3-step plan: 1. Read the case study closest to your project. 2. Note the questions it raises. 3. Talk to the team that delivered it.

  1. Choose the most relevant project.
  2. Read the full case study.
  3. Compare it with your site and schedule.
  4. List your questions.
  5. Book a call with USP&E.

Resources

EPC · O&M · About USP&E · Case studies · Contact · Inventory · O&M and SmartPower.

FAQ: Power plant logistics case studies

Where can I read full USP&E case studies?

USP&E publishes full case studies on uspeglobal.com under the case studies page. Each summary on this page links to the relevant write-up so you can read the details.

Which sectors do the case studies cover?

USP&E case studies cover mining, utilities, industry, oil and gas and data centres, including mine power in Tanzania and Mali, turbine supply for NEOM and Frame 6B rebuilds for US hyperscale developers.

Are these projects delivered by USP&E itself?

Yes. USP&E is a full-service EPC and O&M contractor, not a broker. The case studies describe equipment supply, engineering, refurbishment and operations carried out by USP&E teams.

Can I speak to the team behind a case study?

USP&E can connect you with engineers from its Johannesburg, Cape Town, Colorado Springs, Knoxville, London or Wuxi offices who understand the project closest to your needs.

How many projects has USP&E delivered?

USP&E has delivered 150+ power projects in 45+ countries, with 25,000 MW contracted since 2002. The case studies are a selection of that work.

Take the Next Step With USP&E

Your next step on the projects in our case studies decides whether the next quarter brings power or more waiting. Reach USP&E through our contact page, on +27 10 822 2324 or at info@uspeglobal.com, and review live equipment in the meantime.

SEARCH INVENTORY

Powering Possibility. Built for the Frontier.


Where we operate

USA | AFRICA | UK | UAE | CHINA

USP&E United States

Colorado Springs Office: 1755 Telstar Dr, Suite 300

Knoxville Office: 800 S Gay St, Suite 700

USP&E South Africa

Johannesburg Office: 22 Kildoon Rd, Bryanston

Cape Town Office: 31 Brickfield Road, Woodstock

USP&E United Kingdom

London Office: 162-168 Regent Street

USP&E China

China Office: No. 1, Ningzhou Road, Wuxi

Call:+27 10 822 2324  |  E:info@uspeglobal.com

ISO Certifications
ISO9001ISO45001

Powering Possibility. Built for the Frontier.
Full-service EPC & O&M. Not a broker.

© 2026 USP&E · SmartPower Logistics is part of USP&E