Definitive Feasibility Study Ghana – USP&E Africa

USP&E Africa: Definitive Feasibility Study Ghana

USP&E Africa’s services in Power Station Consulting Ghana and Definitive Feasibility Study Ghana (DFS) allow our clients to regulate the local fuel quality, availability, and internal stored energy of fuel stocks in the region. At USP&E Africa, we produce an accountable and defensible execution plan and cost analysis.  Our Definitive Feasibility Study Ghana (DFS) will include a Quantitative Risk Analysis that will lead to an expected value output of total CAPEX, with a contingency. The Definitive Feasibility Study Ghana (DFS) will include information on fuel suppliers, delivery reliability, fuel costs, quality of fuel stocks and availability of qualified maintenance personnel. The Definitive Feasibility Study Ghana (DFS) will also provide local information on water supplies, local skilled labor costs, and environmental regulations.

For more information on Definitive Feasibility Study Ghana or USP&E Africa in general, click here or go to www.uspowerco.com.

Below is a list of our other services:

  • EPC and O&M services for HFO, Gas Turbine, and Hybrid solar and waste heat recovery solutions
  • Surplus, new, and reconditioned power station assets in stock and ready to ship
  • Full financing, leasing, or IPP options
  • Power Station Risk Management
  • Bankable Feasibility Studies

 

CONTACT US TODAY

USP&E Africa (South Africa address)

JOHANNESBURG

Willow Wood Office Park

Cnr 3rd Ave & Cedar Road

Broadacres, Gauteng 2021

Tel: (011) 064 5600

Mob: (072) 955 2560