Are you looking for a company that provides expert power plant services, specifically in HFO Power Plant Design South Africa? You’re in the right place, get in touch with us USP&E Africa, we specialize in HFO Power Plant Design South Africa, EPC and O&M, full financing, leasing, or Independent Power Producer option and more (click here to go to our main site).
Click here to read more on our EPC (Engineering, Procurement and Construction)
Click here to read more on our O&M Services

Our Containerized HFO Generators
Our containerized HFO Power Plant is a generator in a shipping container that runs on heavy fuel oil, we also supply generators that run on diesel and medium fuel oil.
The stationary power station will be supplied with all auxiliaries required for the proper operation of the power plant. The following table is a representative listing of the included auxiliary equipment.
|
For more information on our HFO Power Plant Design South Africa and the other services we have to offer, please contact us at info@uspowerco.com or go to www.uspowerco.com.
Below is a full list of our other main services:
- Bankable feasibility studies for as little as R 500, 000.00
- EPC and O&M services for HFO, Gas Turbine, and Hybrid solar and waste heat recovery solutions
- Surplus, new, and reconditioned power station assets in stock and ready to ship
- Full financing, leasing, or IPP options
USP&E Africa (South Africa address)
JOHANNESBURG
Willow Wood Office Park
Cnr 3rd Ave & Cedar Road
Broadacres, Gauteng 2021
Tel: (011) 064 5600
Mob: (072) 955 2560
