Power Products: Diesel Generator Sets Johannesburg



Are you looking for a diesel generator set for your business? Our diesel generator sets range from 10kW all the way up to 650MW, to have a look at our inventory and what’s in stock, click here (http://www.uspowerco.com/all/generators). We have Containerized HFO Power Plant Generators, Natural Gas Generators, Containerized Diesel Generators, Geo Thermal Turbine Generators and more. If you’re not looking to purchase a new diesel generator sets, we also have affordable second hand generators which you can browse through according to the power specs you are hoping to have for your project (http://www.uspowerco.com/used/generators).

HFO Power Plant
HFO Power Plant in Sierra Leone built by USP&E

 

Diesel Generator Sets Johannesburg: World Renowned Manufacturing Brands

At USP&E Africa, other than supplying diesel generator sets of our own brand, we have strategic partnerships with various OEM brands like Cummins, Hyundai, Wärtsilä, Niigata, MAN, Cummins, Baldor, Perkins, MTU/Detroit Diesel, Cat, Fairbanks Morse and Waukesha.

For more information on Diesel Generator Sets Johannesburg, please contact us at info@uspowerco.com or go to www.uspowerco.com to view more of our power station equipment and services and energy generation solutions.

Below is a full list of our other main services:

  •  Bankable feasibility studies for as little as R 500, 000.00
  • EPC and O&M services for HFO, Gas Turbine, and Hybrid solar and waste heat recovery solutions
  • Surplus, new, and reconditioned power station assets in stock and ready to ship
  • Full financing, leasing, or IPP options

USP&E Africa (South Africa address)

JOHANNESBURG

Willow Wood Office Park

Cnr 3rd Ave & Cedar Road

Broadacres, Gauteng 2021

Tel: (011) 064 5600

Mob: (072) 955 2560

© 2026 USP&E
Privacy · FCPA & OFAC Compliance