USP&E Africa: Generator Distributors South Africa

The Generator Distributors South Africa you should know about

Founded in 2002, USP&E Global has grown to become a globally recognized firm for being a trusted supplier of diesel generators. USP&E Africa are the strategic offices of the company and we are aiming to establish a status of the most trusted Generator Distributors South Africa. We are not new to the continent of Africa, having been operational in Sierra Leon for years now, carrying out O&M (Operations and Maintenance) at the Marampa Iron Ore mine where we work in partnership with the London Mining Company. We built the custom made Power Plant that is used at the site.

Generator Distributors South Africa - USP&e Africa
HFO Power Plant in Sierra Leone built by USP&E

Our Containerized HFO Power Plant

As Generator Distributors South Africa, we aim to give our customers not only a variety of power plant solutions, but also state of the art solutions. Take a look at our Containerized HFO Power Plant:

  • Containerized HFO Power Plant
  • Quick and Easy Four-Week Installation (per HFO Engine)
  • Low-Cost HFO Power Stations
  • Long-Life Containerized HFO Generators
  • Fuel-Efficient – Reduced Total Cost of Ownership for HFO Power Station Solutions
  • Medium-Speed HFO Generators
  • 50 or 60 Hertz HFO Packaged Power Solutions
  • Any Voltage
  • All Switchgear, Controls, Auxiliaries and Tools Included
  • Brand-New with Full Warranty – Bergen, HHI, Cat, Wartsila, MAN and other engines in customized USP&E Containerized HFO Packages

 

To view in detail click here. We like to call it a complete power station in a box, because it is. More than that, it is a plug-and-play design, so it can be built, shipped and installed quickly by our expert engineers.

This is just one of our products from our inventory. We offer a lot more in power plants solutions. We strive to be the most trusted Generator Distributors South Africa and the rest of the world.

For more information on our products and services, go to www.uspowerco.com. If you are in another part of the globe, please don’t hesitate to view the location of our other offices, click here. We work hard to provide shipping of these HFO Diesel Generators Johannesburg and our other diesel generators and cheap Containerized HFO Power Plants South Africa no matter where you are in the world.

Below is a list of our other main services that may interest you:

  • Bankable feasibility studies for as little as R 500, 000.00
  • EPC and O&M services for HFO, Gas Turbine, and Hybrid solar and waste heat recovery solutions
  • Surplus, new, and reconditioned power station assets in stock and ready to ship
  • Full financing, leasing, or IPP options

 

USP&E Africa (South Africa address)

JOHANNESBURG

Willow Wood Office Park

Cnr 3rd Ave & Cedar Road

Broadacres, Gauteng 2021

Tel: (011) 064 5600

Mob: (072) 955 2560