New Gas Turbines with SmartPower-Ready Handover

SmartPower Logistics

New Gas Turbines for Plants That Run on Data-Driven O&M

##

Buying a new gas turbine without a digital O&M pathway is how owners inherit orphaned assets. USP&E supplies brand-agnostic new and new-surplus turbines — including modular FX-45 planning for 2028 — and hands them over with SmartPower monitoring, UpKeep-style CMMS structures, and inventory-backed spare logistics.

Speed-to-Power Without Sacrificing Asset Discipline

OEM queues stretch. Frontier and hyperscale schedules do not. USP&E shortens the path from inquiry to energised site by combining entrepreneurial speed with engineering credibility: verified supply, EPC integration, commissioning, and O&M continuity.

Digital Pathway at Commissioning

  1. Asset register and CMMS hierarchy loaded before commercial operation.
  2. SmartPower KPI views aligned to protection and performance proving.
  3. Spare kits and major rotating components reserved against known lead times.
  4. Local operators trained to close work orders — not just acknowledge alarms.

Live claim you may cite: SmartPower has supported about 26% downtime reduction in USP&E’s data-centre power context.

Commercial Structures

  • EPC purchase with O&M and SmartPower handover
  • Bridge / rental power into permanent new capacity
  • IPP partnerships where offtake and availability drive the model
  • Lifecycle extended warranty when USP&E supplies, engineers, executes, and operates

Why owners choose USP&E

85+Countries guided
35+Countries with completed utility-scale projects
18Live projects in 11 countries
400+Engineers & project managers
ISO9001 & 45001 certified

USP&E is a full-service engineering, EPC and O&M company, not a broker. One team designs, builds and runs your plant, so nothing falls between contracts.

Facing a power challenge on site?

Tell us your load, fuel and timeline. A USP&E engineer will come back with options for SmartPower Logistics projects, not a sales pitch.

Where we operate

USA | AFRICA | UK | UAE | CHINA

USP&E United States

Colorado Springs Office: 1755 Telstar Dr, Suite 300

Knoxville Office: 800 S Gay St, Suite 700

USP&E South Africa

Johannesburg Office: 22 Kildoon Rd, Bryanston

Cape Town Office: 31 Brickfield Road, Woodstock

USP&E United Kingdom

London Office: 162-168 Regent Street

USP&E China

China Office: No. 1, Ningzhou Road, Wuxi

Call:+27 10 822 2324  |  E:info@uspeglobal.com

ISO Certifications
ISO9001ISO45001

Powering Possibility. Built for the Frontier.
Full-service EPC & O&M. Not a broker.

© 2026 USP&E · SmartPower Logistics is part of USP&E