Natural Gas Generators South Africa: The Future of South African Energy
Is the lack of power the most prevalent problem in Africa? Are natural gas generators South Africa the solution to the problem? Firstly, there are other issues like poverty and diseases such as HIV/AIDS and Malaria might get headlined often, but if the countries of Africa benefited from the economic growth that could come about with increased production (due to efficient power supply), it’s possible that the other problems could diminish. Africa needs energy, and not only the developing nations, but also developed emerging markets like South Africa that suffer from energy deficiency.
Is natural gas the answer to South Africa’s energy deficiency? Energy is the major driver of economic growth around the world. With the rapid global population increase, countries are challenged to meet their socio-economic energy demands. The country’s bulk energy source, production and consumption are unsustainable, and pose various threats to the country’s socio-economic development.
Currently, coal is the primary means for deriving energy (accounting for more than 80% of the country’s generated electricity) but this has a negative effect on the climate because of the high levels of carbon emissions which potentially causes human health hazards.
Reportedly, the South African government has committed itself to more eco-friendly ways of producing energy.
However, of late, offshore gas has been emerging as a major component of the global energy mix, as well as the most preferred alternative to the fossil fuels. This gas is eco-friendly due to its low carbon emission after combustion. It is tapped from beneath the ocean through a process called horizontal drilling, which is less harmful to the environment and uses less volumes of water than fracking.
Also, it must be noted that gas has the potential to surpass coal as the primary source of energy by 2030.
At USP&E Africa, we carry out detailed studies of the best possible implementations for deriving energy in emerging markets like South Africa. We specialize in retailing power plant equipment such as Natural Gas Generators South Africa. Click here to view our online inventory. We have a team of experts that are experienced in power plant projects around the world and strive to produce great results with USP&E clients. We are no strangers to Africa’s power problems, and strongly believe that with our knowledge and skills we can come alongside clients to provide solutions to the power pandemic of the continent.
For more information on Natural Gas Generators South Africa or USP&E Africa in general, click here or go to www.uspowerco.com.
Below is a list of our other main services:
- Bankable feasibility studies for as little as R 500, 000.00
- EPC and O&M services for HFO, Gas Turbine, and Hybrid solar and waste heat recovery solutions
- Surplus, new, and reconditioned power station assets in stock and ready to ship
- Full financing, leasing, or IPP options
USP&E Africa (South Africa address)
JOHANNESBURG
Willow Wood Office Park
Cnr 3rd Ave & Cedar Road
Broadacres, Gauteng 2021
Tel: (011) 064 5600
Mob: (072) 955 2560
