Diesel Generators

Diesel Generators from 1MW to 100MW provided by USP&E Global. Discover the generator that is right for your industrial project with the services required to efficiently run your power plant.

USP&E Global offers premium surplus and used diesel generators to emerging markets worldwide with all supporting services required by our clients. We have over twenty years of experience selling diesel power plants and have serviced many power plants during this time too.
Diesel power plants are use less fuel and produce sufficient power required by the client, based on the power needs of the project. These power plants can also handle more loads due to the heavy duty nature of diesel power plants.
Find out more by visiting USP&E Global
Contact is today at info@uspeglobal.com
Diesel generator

Where Can I Buy Containerized HFO Generators South Africa?

USP&E Africa sells Containerized HFO Generators South Africa, carrying out full power station engineering, equipment procurement and construction of the project. Our containerized HFO Generators are designed to provide utility grade power configured either as part of a larger power plant design or standalone as an island power generating system. These generator packages have been […]

Where Can I Buy Containerized HFO Generators South Africa? Read More »

Power Station Projects Sierra Leone

USP&E Africa is power generation Solutions Company that aims to build, engage in, or at least spark Power Station Projects Sierra Leone in some way, to help the nation progress economically. Much of the West African nation’s power generation capacity was hampered during the country’s civil war (1991 – 2002). The nation of Sierra Leone

Power Station Projects Sierra Leone Read More »

Value Feasibility Study Central Africa

Value Unlocked USP&E Feasibility Study Central Africa The reason why we value and encourage feasibility study Central Africa preparation especially in the life cycle of a resource development project is because it shows you what  expenses operating and capital the project is going to cost. This gives the client a picture of the future prospects of the

Value Feasibility Study Central Africa Read More »

BFS DFS Johannesburg USP&E AFrica

USP&E solution BFS DFS Johannesburg USP&E was founded in the state of texas in the united states of america and over the last decade we have grown and become more better in providing emerging markets with power generation solutions that drive down cost for any project. this is because we understand emerging markets theirs needs

BFS DFS Johannesburg USP&E AFrica Read More »

Bankable Feasibility Study for Multi-Fuel Power Plant

Bankable Feasibility Study for Multi-Fuel Power Plant At USP&E we perform Bankable Feasibility Study for Multi-Fuel Power Plant. We integrate multiple sub units to accommodate different fuels. Our Bankable Feasibility Study for Multi-Fuel Power Plant allows you to critically analyze your Multi-Fuel Power Plant. The Bankable Feasibility Study for Multi-Fuel Power Plant covers the broadest

Bankable Feasibility Study for Multi-Fuel Power Plant Read More »

Definitive Feasibility Study Ghana – USP&E Africa

USP&E Africa: Definitive Feasibility Study Ghana USP&E Africa’s services in Power Station Consulting Ghana and Definitive Feasibility Study Ghana (DFS) allow our clients to regulate the local fuel quality, availability, and internal stored energy of fuel stocks in the region. At USP&E Africa, we produce an accountable and defensible execution plan and cost analysis.  Our

Definitive Feasibility Study Ghana – USP&E Africa Read More »

USP&E Africa Renewable Energy Solution

What is Africa Renewable energy solution It is a fact that the constant rising of electricity and constraints on electricity networks in Africa and across the world have brought about the need for independent power stations for industries that do critical business that require a reliable constant supply of electricity..USP&E has the right Africa renewable

USP&E Africa Renewable Energy Solution Read More »