The power plant infrastructure required for power generation in West Africa is arguably too costly for the nations to combat the issue of low power production. At USP&E Africa, we sell Solar Power Systems West Africa solutions at affordable prices that can be delivered to you timeously. According to resources, Africa is a low investor in the global solar market at the moment.
Africa has a lot of solar potential. A number of countries in West Africa receive a very high amount of bright sunlight for most the days per year. A 50 MW photovoltaic power plant has been planned for Garissa in Kenya which is expected to produce approximately 76,473 MWh/year. USP&E Africa aims to help countries in West Africa combat the power problem by partnering with firms and companies that need efficient power supply generated with solutions like our Solar Power Systems West Africa.
Africa has not been a strong presence in the market of all renewable energies. Bloomberg New Energy Finance reported that $268.7 billion of global investment in renewable energy made over recent years, only about $4.3 billion was made in Africa, of which most went to South Africa and North Africa.
USP&E Africa are trusted distributors of SunLeap™ Solar Power Systems West Africa. This Sunleap™ solution is a fully integrated DC or AC power distributed power generation system, providing high efficiency, lower total cost of ownership, and forward compatibility for remote applications. You can read more about it here.
SunLeap™ Micro MPPT Converters
- Allowing MPPT at PV level for maximum harvesting and redundancy
- Built in redundancy, no single point of system failure
- Resilient to debris, dust, and shading
- Light weight (1.2 lbs) and compact design
- Simple design, quick installation, and easy management
- Flexibility to use 12V, 24V, 36V, & 48V PV Modules or mix technologies
- System availability > 99.8%
- Flexibility to deploy in individual, string, or centralized architectures
- Modular 3KW-6KW DC solar systems in 19 inch (2U) shelf mount.
- High efficiency: 97%
- 24V or 48V DC Converters power range: 250W – 2500W
- Parallel system for 3KW – 250KW
- MPPT efficiency gains: 10% – 30%
SunLeap™ Inverters
- Allowing MPPT at PV level for maximum harvesting and redundancy
- System availability > 99.8%
- Built in redundancy, no single point of system failure
- Flexibility to use 12V, 24V, 36V, & 48V PV Modules
- Simple design, quick installation, and easy management
- Extremely light weight compact design
- Flexibility to deploy in Individual, string or centralized architectures
- Resilient to debris, dust, and shading
- Power range: 1000W – 5000W
- Modular system: 1000W – 500KW
- High efficiency: 96%
- MPPT efficiency gains: 10% – 30% – See more at: http://www.uspowerco.com/green-power/sun-leap#sthash.yst3nF9L.dpuf
Please get in touch with us today, if you want to know more about our power plant solutions like our diesel generators, natural gas generators, and other things we have in stock, we’re just a call away. Call today and purchase a Solar Power Systems West Africa, USP&E Africa is the global power plant solutions provider for you. Also, check out www.uspowerco.com. If your company or company’s project is not in South Africa, we have strategic offices in other locations, just click here to view.
Here’s a list of our other main services that may interest you:
- Bankable feasibility studies for as little as R 500, 000.00
- EPC and O&M services for HFO, Gas Turbine, and Hybrid solar and waste heat recovery solutions
- Surplus, new, and reconditioned power station assets in stock and ready to ship
- Full financing, leasing, or IPP options
USP&E Africa (South Africa address)
JOHANNESBURG
Willow Wood Office Park
Cnr 3rd Ave & Cedar Road
Broadacres, Gauteng 2021
Tel: (011) 064 5600
Mob: (072) 955 2560
