Power Plant Fuel Consumption South Africa

SmartFeeder Technology: Helps with Power Plant Fuel Consumption South Africa

You might be sitting there asking how does SmartFeeder technology help with Power Plant Fuel Consumption South Africa? Well, when you purchase SmartFeeder technology, it comes with a standard service package that helps you with configuring of the SmartFeeder system and for monitoring your fuel savings.

This state of the art control and communication software has the following features:

  • Monitors 24/7 to ensure 100% operability
  • Performs real-time monitoring of fuel consumption and additive consumption including a log of fuel re-filling + additive tank filling
  • Your own website available from the office or your laptop to monitor the system or view in real-time the actual quantities of fuel or additive remaining in the tank
  • Alarm notification if any system activities fall outside of set boundaries (such as fuel or additive theft)
  • The ability to remotely make changes to the system parameters
  • All software & firmware updates

 

The SmartFeeder Fuel and System Monitoring Package allows you to check for complete information of fuel and additive use. Moreover, instant verification of current fuel consumption and fuel savings achieved by the injection of fuel additives. This enables you to know how much fuel you’re using and how much money you’re saving every day. So if your concern for power generation at your project site is Power Plant Fuel Consumption South Africa, then SmartFeeder Technology is a product worth investing in.

Contact us today for more information on what we have in stock, as well as our prices. For more information on how to save and use fuel more efficiently, get in touch with us, we help with Power Plant Fuel Consumption South Africa. For further queries, please go to www.uspowerco.com. To view the location of our other offices, click here.

Below is a list of our other main services that may interest you:

  • Bankable feasibility studies for as little as R 500, 000.00
  • EPC and O&M services for HFO, Gas Turbine, and Hybrid solar and waste heat recovery solutions
  • Surplus, new, and reconditioned power station assets in stock and ready to ship
  • Full financing, leasing, or IPP options

 

USP&E Africa (South Africa address)

JOHANNESBURG

Willow Wood Office Park

Cnr 3rd Ave & Cedar Road

Broadacres, Gauteng 2021

Tel: (011) 064 5600

Mob: (072) 955 2560