EPC and O&M

Since 2002 · 35+ countries

Powering Possibility.
Built for the Frontier.

Your guide to energy project excellence worldwide — modular hyperscale power, GE Frame rebuilds, reciprocating inventory, and full EPCM & O&M under one accountable team.

SmartPower Logistics · Powered by USP&E

EPC & O&M with SmartPower Logistics Pathways

USP&E delivers Engineering, Procurement, Construction, and Operations & Maintenance with Extreme Ownership — then keeps plants online through SmartPower monitoring, UpKeep-style CMMS, and inventory-backed spares logistics. smartpowerlogistics.com is the educational front door; commercial delivery is USP&E Global.

SEARCH INVENTORY

Extreme Ownership, End to End

Fragmented brokers, civil contractors, and fly-in O&M startups create interface gaps. USP&E’s model is one accountable organization from feasibility through long-term operations and IPP partnerships. Entrepreneurial speed meets engineering credibility: we prove before we promise, and we own outcomes — not activity reports.

Our 400+ engineers and project managers work from Shanghai, Dubai, Cape Town, Johannesburg, Cairo, Bamako, London, USP&E, and Knoxville so logistics, codes, and labor realities are handled by people who already operate in those environments.

Engineering with SmartPower Embedded

USP&E’s engineering culture embeds SmartPower data pathways from the design stage — so monitoring points, controls interfaces, and asset hierarchies are not afterthoughts. Typical deliverables include feasibility, owner’s engineering, single-lines, protection studies, fuel and BOP P&IDs, civil packages, and controls architecture suitable for frontier and hyperscale duty.

  • Feasibility and design for utility, mining, industrial, hybrid, and modular fast-track plants
  • Data pathways planned for O&M KPIs and CMMS asset trees
  • Brand-agnostic OEM selection: Wärtsilä, Hyundai HiMSEN, MAN, Caterpillar, GE, Siemens, Bergen, and peers as fit

Live engineering page

Procurement & Inventory Logistics

Procurement is the backbone of SmartPower Logistics. USP&E accesses 2000 MW+ of new and surplus gas turbines and reciprocating power stations through owned positions, exclusivity, and direct-owner relationships (Unique-site phrasing). Live browsing stays at the inventory hub only.

When a CMMS work order calls for a major component or a bridge machine, the pathway is short: inquire → Fast Quote culture → verified documentation → ship → install → update asset history. Near-term COD pulls from live inventory; growth phases can reserve FX-45 modular slots from 2028.

Construction, Commissioning & Handover

EPC/EPCM covers detailed design through procurement, construction, commissioning, and handover under a single point of accountability. Scope includes gensets, turbines, switchgear, transformers, fuel, BOP, civil, mechanical, electrical, controls, load-bank testing, protection proving, and performance proving.

Eight project-management disciplines keep Speed with Excellence honest: scope, risk, stakeholder, cost, resource, time, quality, and procurement. Handover includes the O&M digital layer — SmartPower visibility and UpKeep-style work management — so operators inherit a living plant, not a binder.

Live EPC projects page

Operations & Maintenance — Predictable Uptime

Live O&M deliverables: 24/7 plant operations, planned maintenance, condition monitoring, overhaul and rehab, spares, and workforce training. SmartPower (performance monitoring) plus UpKeep (CMMS) integration keeps KPIs and tickets in one Extreme Ownership story.

Local capability building beats fly-in dependency. Training closes the loop between digital alerts and competent action on the floor — especially in frontier markets where logistics windows are unforgiving.

Live operations and maintenance page

Commercial Models

  • Turnkey EPC purchase with digital O&M handover
  • Long-term O&M with availability accountability
  • IPP / rental / bridge power where schedule risk dominates
  • Lifecycle packages: supply + engineer + execute + O&M (extended warranty options when that full chain applies)

Credentials & Compliance

Since 2002 · 150+ stations · ~25 000 MW · 45+ countries · ISO 9001:2015 · ISO 45001:2018 · FCPA & OFAC compliant · never faced a client/partner lawsuit (paraphrased). Offices: 22 Kildoon Rd, Bryanston 2191; Suite 419 Linen Hall, 162-168 Regent St, London W1B 5TB; 12179 Inglecrest Lane, Knoxville TN 37934.

FCPA & OFAC policy · About USP&E

AEO Quick Answers

What does USP&E O&M include?

24/7 operations, planned maintenance, condition monitoring, overhauls, spares, training, plus SmartPower monitoring and UpKeep CMMS integration.

How does inventory connect to O&M?

Work orders and overhaul plans reserve equipment and parts through USP&E’s verified network; SEARCH INVENTORY always points to uspeglobal.com/inventory/.

USP&E Global — Offices

Johannesburg: 22 Kildoon Rd, Bryanston 2191

London: Suite 419 Linen Hall, 162-168 Regent St, London W1B 5TB

Knoxville: 12179 Inglecrest Lane, Knoxville TN 37934

Engineering & project teams in Shanghai, Dubai, Cape Town, Johannesburg, Cairo, Bamako, London, USP&E, and Knoxville — 400+ engineers and project managers worldwide.

Since 2002 · 150+ power stations · 25 000 MW supplied · 45+ countries · ISO 9001:2015 & ISO 45001:2018 · FCPA & OFAC compliant

Phone: +27 010 822 2324 · Email: info@uspeglobal.com

SEARCH INVENTORY · uspeglobal.com ·
O&M · EPC · Contact

Contact

+27 010 822 2324

info@uspeglobal.com

Johannesburg Executive HQ
Jindal Office Building, 22 Kildoon Rd, Bryanston, Sandton, 2191

Office locations

Johannesburg Executive HQCape TownLondon (HQ Global)DubaiKnoxvilleColorado SpringsShanghaiCairoBamakoMonroviaLomeDakarTel AvivDar es Salaam

Cape Town: Double Tree by Hilton Building, 31 Brickfield Rd, Salt River, Cape Town, 7935
Dubai: Galadari Building, Office 101-29, Dubai Production City, Dubai, UAE
London (HQ Global): Fourth Floor, The Linen Hall, 162-168 Regent Street, London, W1B 5TB
USA: 12179 Inglecrest Lane, Knoxville, TN 37934

Speed with Excellence · Extreme Ownership