SmartPower

Advanced Digital Power Plant Monitoring

SmartPower and Predictive Maintenance

Smart Power generator monitoring not only provides real-time performance data but facilitates predictive maintenance. This allows engineers to get a digital view of their power plants and which engine parts are performing effectively. 

The Importance of predictive maintenance

Predictive maintenance prolongs the use of large-scale commercial generators or power plants. This heavy duty machinery benefits from predictive maintenance by allowing the engineers to do minor regular  maintenance based on power plant analysis.This prevents entire overhauls or long services which brings along long delays. 

Start with SmartPower today by contacting us at info@uspeglobal.com 

Smart power diesel generator management

SmartPower transforms the way data is captured and analysed

01.

Integration of up to 1 million sensors

02.

Smart Power is updated every 5 seconds

03.

Real-time cost $/kwhr tracking

04.

A.I powered predictive analytics

05.

smart Power improves real-time monitoring

06.

Full plant remote control capabilities

07.

100% OEM agnostic

08.

Improved O&M team safety

09.

Full hybrid integrations

10.

Full machine learning functionality

11.

Asset life trend analysis

12.

Enhanced predictability